Bats will soon be able to move in! The first prototypes of the bat box that can be integrated into ETICS are nearing completion and will soon be mounted on building façades for the initial testing phase.
The loss of roosting sites due to energy-efficient renovations affects many bat species that rely on crevices and cavities in buildings for shelter. The FLAUSBAU project brings together effective species conservation and modern architectural concepts: The bat box modules developed “disappear” into the building’s façade while simultaneously meeting the requirements for energy-efficient facade insulation.
Modern Insulation Technology for Homes and Bats
Material selection is a key aspect of the boxes’ development: The façade must be optimally insulated while also creating a roost that protects bats from heat, wind, and the elements. To this end, four prototypes were developed to test various factors. The body is made of various materials, including rock wool, which is designed to provide the animals with optimal protection from the heat.
The interior was specifically tailored to the needs of different bat species, such as pipistrelles and broad-winged bats:
● Multi-chamber architecture: The modular design features columns that taper toward the sides. Each column is intended to accommodate animals of different sizes, allowing the animals to move to a different chamber based on their climatic preferences. This also enables the animals to choose between cooler and warmer sections within the bat box depending on the outside temperature and sunlight.
● Grip-Optimized Surfaces: The interior walls are coated with cork to ensure the animals have a secure grip when crawling and hanging.
● Discreet Entry Openings: Only the entry area is visible on the exterior. Inside, the size of the entry slits varies to accommodate the preferences of different bat species, while maintaining a uniform appearance from the outside. The entry edge is coated with a weather-resistant finish. The slope toward a drip edge makes the box maintenance-free.
Start of the First Test Phase
Following an intensive exchange on materials and design with specialists and experts from the project’s working group, practical testing is now set to begin. The four different prototype boxes will be installed in the coming weeks on buildings with bat populations in Rhineland-Palatinate, Brandenburg, and Saxony. When selecting installation sites, care was taken to ensure that as many building-dwelling species as possible would be encountered across all test locations. The Leibniz Institute for Zoo and Wildlife Research (IZW) will soon begin its monitoring program. This will be aided by a specially developed technology being tested in the prototype boxes. A light sensor measures the number of bats entering the box, while echolocation recordings provide information on bat species. Sensors measure temperature and humidity trends to study the microclimate inside the box. The results from this technology are verified and supplemented by exit counts and echolocation recordings.
After evaluating the first test phase, the design will be optimized into a final box design, which will be certified. These final boxes will then be installed at 50 renovation sites nationwide and will continue to be scientifically monitored. Upon completion of the project in 2031, the construction plans and results will be made available to the general public. The boxes could become standard equipment in ecological building renovations and new construction projects.
With the first meeting of the Project Advisory Group (PAG), a central component of the project’s technical and scientific support structure has been launched. Within projects funded by the German Federal Agency for Nature Conservation, project advisory groups bring together a range of professional perspectives. The aim is to connect science, administration, practice, and planning at an early stage and to ensure continuous expert support throughout the project’s implementation.
The current PAG brings together a broad range of stakeholders. In addition to the project leads and representatives of the Federal Agency for Nature Conservation, it includes experts from state authorities such as the State Office for the Environment (LfU) as well as the Ministry for Climate Protection, Environment, Energy and Mobility (MKUEM). The group is further complemented by experts from nature conservation organisations, the Berlin Senate Department, consultancy offices, and the construction and planning sector.
Many of the participants were already involved in the pilot phase and bring valuable experience and continuity to the collaboration. At the same time, the group has been expanded to include additional members, ensuring that further perspectives are integrated into the exchange. Going forward, the project partners involved in the development and construction of the bat roosts as well as the biodiversity monitoring sensor systems will also regularly participate in the meetings and contribute their practical expertise.
The next meeting will focus on the detailed development and coordination of the bat roost concepts. In addition, the PAG will generally meet once a year to accompany and review the overall progress of the project.
We very much look forward to continuing the collaboration and exchange within this diverse group. Bringing together such a wide range of professional perspectives is highly enriching – this diversity is what makes the joint work particularly valuable.
Buildings are being renovated to save energy and protect the climate. This is important. However, for bats, this can be precisely where the problem lies. Many species use crevices and cavities in buildings as roosts. When these are sealed or removed during renovations, the animals lose their refuges – often permanently.
This is where FLAUSBAU comes in: species conservation measures for bats within the framework of energy-efficient building renovations.
Why bats require special protection
In Germany, all bat species are strictly protected. They depend on roosts, which they use, for example, as resting places, for raising young, or for overwintering. For many species, buildings serve as substitutes for natural cave structures. If these roosts are lost through construction or refurbishment measures, it can have significant effects on local bat populations. Consequently, the law mandates that appropriate compensatory measures must be implemented in the event of a permanent loss. These measures are intended to ensure that the so-called continuous ecological functionality (CEF) of the original roost is maintained. In practice, however, bat roosts are often not systematically recorded during energy-efficient renovations. Furthermore, the success of substitute roosts is rarely monitored.
From research to application: the path of FLAUSBAU
The FLAUSBAU project was preceded by a research and development (R+D) project. This clearly demonstrated that bat protection in the context of energy-efficient building refurbishments has been insufficiently studied and that reliable scientific foundations are lacking. Building on this, the FLAUSBAU pilot phase was carried out as part of a testing and development (T+D) project. Both the R+D and T+D projects were funded by the Federal Agency for Nature Conservation using funds from the Federal Ministry for the Environment, Climate Action, Nature Conservation, and Nuclear Safety.
What was investigated during the pilot phase
During the pilot phase, national and international examples of how to deal with building-dwelling bats during energy-efficient renovations were researched. In addition, structured surveys were conducted among environmental authorities, planning offices, environmental associations, and scientific institutions. A total of over 400 people were contacted, and more than 250 experts from Germany and abroad participated in the survey. The results clearly show: bat protection has thus far been insufficiently considered during energy-efficient renovations. At the same time, there is a high willingness to implement scientifically sound and practical solutions. Another focus was on evaluating methods for monitoring the success of substitute roosts. Various recording and monitoring procedures were tested and compared. It became apparent that no single method meets all requirements; rather, a combination of several procedures is necessary for reliable monitoring.
Foundation for the main project
The pilot phase provides the technical and conceptual basis for the main project. The central focus is the development and testing of modular bat roosts that are integrated directly into external thermal insulation composite systems (ETICS). These system solutions are intended to meet both structural engineering and species conservation requirements and be scientifically supported through standardized monitoring. The goal is to develop practical, legally secure, and effective solutions that combine climate protection measures in the building sector with the long-term preservation of bat populations.